944 Palmer Aly NW, Washington, Dc 20001
Washington · DC
Washington · DC
1. SELECTIVE SLAB REMOVAL AND NEW STEEL INSTALLATION TO SUPPORT NEW OPENING ON THE SECOND FLOOR. 2. BRACE FRAME INSTALLATION NOTES AND DIAGRAMS PERTAINING TO STAIR ARE FOR REFERENCE ONLY. FUTURE NEW CONNECTING STAIR BETWEEN GROUND FLOOR AND SECOND FLOOR TO BE PERMITTED UNDER SEPARATE APPLICATION. Area affected 500 SF
Interior work only Replace existing basement bath vanity Partially remodel existing kitchen Remodel existing master bath Remodel existing master closet Remodel existing 2nd floor h…