Roofing Permits in San Francisco, California
1,302 roofing permits filed recently
1,302 permits
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re roofing no hot works, main building roof only, garage excluded
tar and gravel roof removed and we will install duration cool shingle color (tbd) full redeck 15sq . no hot works
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: installing 26 solar pv modules, 450 watts per module, total no. of rating 11.7 kw. mounted: roof, ballasted: n, including 4 energy storage unit, of 240 vac, with 5 kwh each in capacity,...
roof repair: repaint roof (whole roof), patching. no hot works.
revision 2025-0625-9481 to document minor changes to 1st floor footings and 3rd floor/roof framing.
adapting a portion of the undeveloped storage space for residential use. new bedroom and a full bathroom. new deck adapting existing roof above the 1st floor into balcony. new door to terrace at 2nd f...
re-roofing: remove existing roof to wood sheathing & reroof using modified bitumen membrance, roofing system along with an approved certainteed sa base sheet, class b fire rated. not hot works, in kin...
re-roofing: remove existing in kind composition shingles and replace with new compositing shingles on roof, class a fire rated, modified bitumen membrance roofing system along with an approved certain...
solar permit: installing 11 solar pv modules, 450 watts per module, total no. of rating 4.95 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 10 kwh each in capacity,...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroof 2300 sq ft tear off, install polyglass, hot work permit#126727