323 issued permits in Mott Haven-Port Morris, part of Bronx, New York. Refreshed every 6 hours from the city's public permit feed.
323 permits
Proposed vertical enlargement to an existing 1-story + cellar community facility building, converting to a 2-story + cellar community facility building.
Removal and replacement of roof structure and components of existing liquid asphalt storage tank# 15 as per plans filed herewith. no change in egress, use or occupancy.
Full demolition to a one story building
Installation of heavy duty side walk shed.as per plan.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Application filed herewith to erect a four story + penthouse eight family residential building & community facility on the first floor
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Installation of emergency heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022…
Removal of existing hvac systems and installation of new hvac systems with for an existing office building. no change of use, egress, or occupancy.
Herewith filing foundation work as per plans.
Removal of existing roof done to roof deck and replace with new roof insulation and single ply membrane. remove existing steel billboard and specified roof top units. all existing…
Removal of existing plumbing fixtures previously filed under bis # 220634623.
Building # 12: Facade repairs to comply with local law 11/98. No change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
New opening in existing first floor facade for new storefront entry. no change to egress ,occupancy ,or use
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of light duty side sidewalk shed as per plan.
Installtion of light duty side walk shed at front as per plan