Other Permits in Brooklyn, New York
7,048 other permits filed recently
7,048 permits
Removal of ex. site pavt's, curb wall, and fence in conjuction with renovated playyard entrance ramp. provide new pavt's, curb wall, fencing and railings for ada compliant entrance ramp.
Installation of construction trailer as per plans filed herewith
Proposed maintenance work to the facade. no change to use.
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.
Installation of construction trailer as per plans filed herewith
Propose three story with two family house. obtain new c of o.
general construction work as per plans filed herewith. no change to use, egress or occupancy
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
New 5 story addition with elevator & bathrooms, new exterior ramp, convert existing classrooms for accessibility & ARA rooms, renovate medical suite 3 floor with ADA bathroom, replace seating in aud....
Install 8'-0 height construction fence as per plan. no change to use, occupancy or egress.
Installation of new sidewalk shed at 210 joralemon street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Supported Scaffold installation as per plans filed herewith.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Supported scaffold over existing sidewalk shed and groiund floor as per dwgs filed herewith.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.