Other Permits in Brooklyn, New York
7,048 other permits filed recently
7,048 permits
Fn/is4k - for temporary construction equipment(fence) submitting on behalf of contractor, related to job b08023579-i1. no change in use, occupancy or egress.
iNSTALL APPROXIMATELY 25 LINEAR FEET OF CONSTRUCTION FENCE AT EXP 1&3TO JOIN WITH FENCES INSTALLED AT SAME EXPOSURES OF ADJACENT PROPERTIES790 EAST 37 STREET AND 786 EAST 37 STREET TO ENCLOSE POTENTIA...
Proposed maintenance work to the facade. no change to use.
Install 8'-0 height construction fence as per plan. no change to use, occupancy or egress.
mechanical work as per plans filed
Obtain new co
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Sprinkler work as per plans. No change in use, egress or occupancy (Baseline Club)
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary construction fence for ps 194k at 3117 avenue w, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
file construction fence .
Supported Scaffold installation as per plans filed herewith.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Supported scaffold over existing sidewalk shed and groiund floor as per dwgs filed herewith.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Application filed herewitth to obtain permit in order to resolve ecb violation# 39141040r for cut-out located at side of rear garage to install new glass sliding door at side of garage as shown on pho...
Installation of 440 lf heavy duty sidewalk shed as per plans. no change in egress, use, or occupancy.