Other Permits in Brooklyn, New York
7,084 other permits filed recently
7,084 permits
Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
Installation of new sidewalk shed for jhs 50k at 595 clinton street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Temporary plywood construction fence at rear yard in conjunction with horizontal addition work at rear.
Installation of sidewalk shed
Sidewalk Shed Installation in conjunction with B00916346 and B00916716. No change in use, egress, or occupancy under this filing
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Provide new standpipe system for entire building in accordance with nyc bc & n.f.p.a. #14-20072. for standpipe work only.
Installation of new sidewalk shed for jhs 50k at 595 clinton street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Vertical and horizontal enlargement of existing 3-story residential building to a 6 story with a total of 10 dwelling units, general retail, and community facility
Mechanical specifications filed in conjunction with gc b01220978-i1
Horizontal Enlargement of existing two dwelling units, no change in C of O.
Fence filed in conjunction with GC # B01220978-I1
Sh/ps299k - for temporary construction equipment(shed) submitting on behalf of contractor, related to job b00677375, b01004244 b01004259 . no change in use, occupancy or egress
Structural application:install new c-joists throughout ;install beams at 2nd and 3rd floor extension;there will be no change to use, egress or occupancy.
Propose foundation and foundation wall as per plan for a new horizontal and vertical enlargement to 1-family house, filed in conjunction with GC # B01257756-I1.
Electrification and Heat pump systems
Installation of pipe scaffold for access on areas of work
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Fence application filed in conjunction to alt1
underpinning of adjacent buildings to allow for proposed construction