Other Permits in Brooklyn, New York
7,084 other permits filed recently
7,084 permits
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Subsequent foundation application in conjunction with approved gc #b01080960-i1
Structural application in conjunction with approved gc # b01080960-i1
Installation of pipe scaffold for access on areas of work
Electrification and Heat pump systems
underpinning of adjacent buildings to allow for proposed construction
Vertical and horizontal enlargement of existing 3-story residential building to a 6 story with a total of 10 dwelling units, general retail, and community facility
Installation of new sidewalk shed for jhs 50k at 595 clinton street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Sidewalk Shed Installation in conjunction with B00916346 and B00916716. No change in use, egress, or occupancy under this filing
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of sidewalk shed for public protection during construction work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Proposing vertical and horizontal enlargement to an existing residential building.
Horizontal Enlargement of existing two dwelling units, no change in C of O.
Convert first floor from residental to community facility.
Sh/ps299k - for temporary construction equipment(shed) submitting on behalf of contractor, related to job b00677375, b01004244 b01004259 . no change in use, occupancy or egress
Fence application filed in conjunction to alt1
Install new sprinklers system thoughout new 5-story building
Remove and replace sprinkler heads within new buld out. no change to use, egress or occupancy.