Roofing Permits in Brooklyn, New York
1,391 roofing permits filed recently
1,391 permits
Proposed mechanical work on cellar, 1st to 4th floor & roof. in conjunction with dob now gc job no:b01080558 as per plan. no change in use, egress or occupancy.
Whitman #12, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping i...
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping i...
Temporary roof / overhead protection at adjoining properties during new building const, filed sep. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egr...
installation of solar panels, rooftop, railed, grid-tied, 4 modules, 1.64 KW
Application filed herewith for interior renovation at first andsecond floor, with replacement facade, windows, roof (2) two story, (2)two family building.no change in use, egress or occupancy.
Install new mechanical systems as per plan on the 4th floor and roof. proposed ducted multi-zone inverter heat-pump system which includes 2 outdoor units and 5 interior units. this application is file...
To remove the illegal wood shed extension with metal roofing enclosing the entire rear yard. no change in use, egress, or occupancy. to address ecb violation number 39168028y, 39168027m, 39168026k.
Proposed plumbing work from cellar to 4th floor & roof as per plan. in conjunction with dob alt-co-new building job #b01038958-i1.no change in use, bulk, egress or occupancy. proposed automatic sprink...
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of entire gas piping within the building. Provide electric heat pump system, replace roof drains, area drains, fixtures and associated piping.Partial removal and replacement of sprinklers and...
Suspended scaffolding and roof hoist in order to perform facade exterior work. facade inspections to be done. sidewalk shed to be insttalled under separate application.
Proposed plumbing work from cellar to 4th floor & roof as per plan. in conjunction with dob alt-co-new building job #b01038958-i1.no change in use, bulk, egress or occupancy. proposed automatic sprink...
Installation of solar panels, rooftop, grid tied, railed, 11 modules, 4.51 KW
Filing for structural work at the basement, 1-3, roof associated with Alt-CO #B01242661-I1. No change to use, egress, or occupancy.
Replace roof access hatch with bulkhead.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
1. Minor Renovation at roof level to show Dunnage for the HVAC unit and HVAC duct work 2. to show the dormer on the roof in the front portion 3. no change in use, egress or occupancy 4.This filling is...
To remove the illegal wood shed extension with metal roofing enclosing the entire rear yard. no change in use, egress, or occupancy. to address ecb violation number 39168028y, 39168027m, 39168026k.