Roofing Permits in Brooklyn, New York
1,391 roofing permits filed recently
1,391 permits
1. Minor Renovation at roof level to show Dunnage for the HVAC unit and HVAC duct work 2. to show the dormer on the roof in the front portion 3. no change in use, egress or occupancy 4.This filling is...
Replace roof access hatch with bulkhead.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Proposed plumbing work from cellar to 4th floor & roof as per plan. in conjunction with dob alt-co-new building job #b01038958-i1.no change in use, bulk, egress or occupancy. proposed automatic sprink...
Suspended scaffolding and roof hoist in order to perform facade exterior work. facade inspections to be done. sidewalk shed to be insttalled under separate application.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of solar panels, rooftop, grid tied, railed, 11 modules, 4.51 KW
To remove the illegal wood shed extension with metal roofing enclosing the entire rear yard. no change in use, egress, or occupancy. to address ecb violation number 39168028y, 39168027m, 39168026k.
Filing for structural work at the basement, 1-3, roof associated with Alt-CO #B01242661-I1. No change to use, egress, or occupancy.
P.S.004K:scope of work includes new emergency generator with integral double wall 275 gallons belly tank with rupture basin located on roof of the new building. This application is filed in conjunctio...
Herewith filing foundation and excavation work in conjunction with application number B01234238. No change in use, occupancy, egress. No work to roof under this application.
Decommission of existing vzw site. remove equipment from basement. remove 11 antennas, 3 rrh 2 ac units and 2 gps from roof. remove cables from basement, 1-4 and roof. no change in use, egress or occu...
Facade repairs and roof replacement. No change in egress, use or occupancy.
Existing 2 story with cellar and basement, two family building with structure work on roof and new bulkhead in conjuction to job# b01222378-i1. no change in use means of egress or occupancy.
k12: Remove & replace Brinck and Masonry Works, Door and Window Replacement including Window Guards, Remove & replace Parapet walls, Roofing and As-Built Roofing, Reflashing of Roof Curves, Repair & R...
Facade repairs and roof replacement. No change in egress, use or occupancy.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
New security lighting installation on 1st floor & also on the roof top parapets. This amendment is filed to change the Asbestos Compliance to a Non Asbestos Building. See Comments. Building is built a...
Filing to decom existing antenna site.Removal of 9 antennas, 6 RRU's, 1 GPS & equip platform on the roof. Initial install approved under app # 420810901, 420176838, 402103763, 400699712 & Q00094357. N...
k12: Remove & replace Brinck and Masonry Works, Door and Window Replacement including Window Guards, Remove & replace Parapet walls, Roofing and As-Built Roofing, Reflashing of Roof Curves, Repair & R...