Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Localized masonry repairs, waterproofing system and rail replacement of the main bulkheads and roofs. No change to use, egress, or occupancy as per plans filed herewith.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Structural modifications for new steel framing at 5th fl, roof level, and wall opening for exhaust ductwork including limited concrete infil of minor existing mep penatrations at roof. no change in us...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Remove walk-in freezer and install new walk-in freezer. Install condenser on 2nd floor roof.
Modification to T-Mobile site. Install 3 antennas, Replace 12 antennas and 6 RRU units on roof. Remove 3 RRU units on roof. Remove 3 existing cabinets and install 2 cabinets on existing platform on th...
Solar tax installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Localized masonry repairs, waterproofing system and rail replacement of the main bulkheads and roofs. No change to use, egress, or occupancy as per plans filed herewith.
Facade restoration and roof replacement including, window lintels, window sill, brick replacement, breick repointing and painting of fire escapes as per plans submitted herewith. no change in use, occ...
Structural modifications on 2nd floor and roof as related to office renovation of 1st and 2nd floors of MAIN ADMINISTRATIVE BUILDING. No change in use, egress, or occupancy.
Installation of PV system on existing roof no change to egress or use of occupancy
It is proposed to replace (2) 500 gal. hot water storage tanks in the boiler room on the roof with (3) 250 gal. hot water sotragte tanks as shown on plans. no change of use, egress or occupancy.
Installation of PV system on existing roof no change to egress or use of occupancy
Replacement of existing condensing unit on roof. Replacement of existing air handling unit in existing equipment room in cellar. Removal of spot cool unit. Related lineset. All work in compliance with...
Installation of PV system on existing roof no change to egress or use of occupancy
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application