Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
General construction for a roofing waterproof membrane and insulation to be replaced.
Installation of PV system on existing roof no change to egress or use of occupancy
Parapet repair as per plans. All work to be completed above the roof line. No change to occupancy, use, or egress.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and continuing on roof top for termination, and gas connection flammable burn uni...
TEMPORARY SHORING OF THE EXISTING 3-STORY BRICK MASONRY HOUSE FROM CELLAR TO ROOF TO RESOLVE ECB 39161852K, 39161853M, and 39161854Y .NO CHANGE IN OCCUPANCY. NO CERTIFICATE OF OCCUPANCY REQUIRED.
Mechanical application filed for installation of new hvac system on cellar, basement, first fl, 2nd, 3rd and roof
Replace all existing roof drains with new roof drains, piping and insulation. replace all existing scupper drains & piping. replace vent piping.
Job filed interior renovation residential units from cellar to roof floor,remove & replace plumbing fixtures per plan. no change of use, egress or occupancy under this application.
Storm drainage for roof of new 1-story rear addition. Minor plumbing modifications at existing house per plans
Installation of PV system on existing roof no change to egress or use of occupancy
Parapet repair as per plans. All work to be completed above the roof line. No change to occupancy, use, or egress.
Storm drainage for roof of new 1-story rear addition. Minor plumbing modifications at existing house per plans
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
TEMPORARY SHORING OF THE EXISTING 3-STORY BRICK MASONRY HOUSE FROM CELLAR TO ROOF TO RESOLVE ECB 39161852K, 39161853M, and 39161854Y .NO CHANGE IN OCCUPANCY. NO CERTIFICATE OF OCCUPANCY REQUIRED.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of PV system on existing roof no change to egress or use of occupancy
Structural modifications on 2nd floor and roof as related to office renovation of 1st and 2nd floors of MAIN ADMINISTRATIVE BUILDING. No change in use, egress, or occupancy.
Installation of PV system on existing roof no change to egress or use of occupancy