Roofing Permits in Brooklyn, New York
1,381 roofing permits filed recently
1,381 permits
Proposed installation of two prefabricated paint Spray Booths, with one prefabricated mix room, duct work thru ceiling and continuing on roof top for termination, and gas connection flammable burn uni...
Mechanical application filed for installation of new hvac system on cellar, basement, first fl, 2nd, 3rd and roof
Job filed interior renovation residential units from cellar to roof floor,remove & replace plumbing fixtures per plan. no change of use, egress or occupancy under this application.
Replacement of existing condensing unit on roof. Replacement of existing air handling unit in existing equipment room in cellar. Removal of spot cool unit. Related lineset. All work in compliance with...
General construction for a roofing waterproof membrane and insulation to be replaced.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Modification to the existing 7500gallon fuel storage system and associated piping including the installation ofnew fuel oil pumps and fuel oil supply and return piping as needed to support thenew emer...
Replacement of chiller heater on the rooftop with a total capacity of 120.4 kbtu/h. no change to egress, use, or occupancy.
Work includes remove and replace exterior curtain wall, windows, parapets, Roofs.
Installation of solar panels, rooftop, railed, grid-tied, 6 modules, 2.58kw
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KW
Installation of sol.ar panels, rooftop, railed, grid-tied, 12 modules, 4.92kw
Strcutural construction of a rooftop/play area on a new raiseddeck framed over existing roof structure as per plans filed herewith.
Renovation of HVAC system on 1st, 2nd, and roof as related to office renovation in MAIN ADMINISTRATIVE BUILDING. No change in use, egress, or occupancy.
Filing herewith for the installation of air cooled split system heat pump system throughout building and installation of bathrooms exhaust system terminating at roof.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the west neighbor's roofs/shaft to the top of the building.
Installation of temporary beta hoist per plan. no change in use, egress, or occupancy. the beta hoist will be on 1st floor and roof.
Installation of temporary beta hoist per plan. no change in use, egress, or occupancy. the beta hoist will be on 1st floor and roof.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the west neighbor's roofs/shaft to the top of the building.
Replacement of chiller heater on the rooftop with a total capacity of 120.4 kbtu/h. no change to egress, use, or occupancy.