765 issued permits in Tribeca-Civic Center, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
765 permits
Provide new Fire Smoke Dampers, Smoke Dampers and Duct Smoke Detectors.
Create first floor slab opening for new interior stair installation in-conjunction with Alt CO #M01352493 to convert existing retail space to Daycare .
Provide new supply domestic water, sanitary, vent & gas piping and all related appurtenances to new plumbing fixtures & equipement with new gas meter and new water heater as shown…
Renovate existing PH: removal & installation of non bearing partitions and related finishes at private laundry, new pergola, new through wall opening for window, roof insulation ab…
Mechanical system and lighting upgrade including,installation of new variable flow chillers; partial lighting and occupancy sensor upgrade
Application filed for interior renovation of non-load bearing partitions, ceilings and finishes on the 1st floor as per plans filed herewith. no change in use, egress or occupancy.
Proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use occupancy or egr…
Modifications to existing plumbing and sprinkler systems. no change to use, occupancy or egress
Swthz-- change of use/occupancy from retail to business for contrast therapy spa. minor partitions modifications.
Filing herewith for the modifications to existing systems at existing units on 7, 8, 9 floors
Mechanical work on floors 2-10, as shown on plans. no change in use, occupancy, or egress. fit-out work filed in conjunction with core & shell alt-co #m00510478.
Installation of temporary shoring system at the cellar level to support the existing cellar mezzanine wood floor framing under existing mechanical room as per plans filed herewith.…
Facade repairs and beam repairs at basement as per drawings. No change in use, egress or occupancy is involved under this application.
Application filed for plumbing modifications/additions in the cellar, 1st and 7th floors as per plans filed herewith. no chang in use, egress or occupancy.
Job accepted to cdu on 5/7/25. filing for change of occupancy from j-3 rectory to j-1 (r-1) rooming units as permitted by hmc 27-2077. interior renovations on floors sub, cel, mez,…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Sweathouz-- general construction inclusive of interior partitions modifications/installations for spa build-out as per plans filed.
Sprinkler/standpipe work as per plans filed.
Proposed sprinkler work in conjunction to arch.designs, no change inuse, egress and occupancy
Plumbing modification work included in scope filed under subsequent application as required. no change in use, egress or occupancy.