305 issued permits in Washington Heights (South), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
305 permits
Installation of temporary construction fence for is 328m at 401 west 164 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under thi…
Installation of pipe scaffold for is 328m at 401 west 164 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
SB 4thFl: Sprinkler, plumbing and standpipe modifications to accommodate alterations at partial 4th floor as per plans.
Selective demo/removal of existing ductwork/valves/controls, install (1) VRF (DOAS) Unit; (1) ERV (Recovery Unit), New Air Outlet/Inlet; New hangers, refrigerant/condensate piping,…
Work includes replacement of existing rooftop exhaust fans/ventilators, Install motorized dampers in basement ductwork. Replacement of piping for existing split system for MDF room…
Installation of debris chute for is 328m at 401 west 164 street, manhattan as per indicated on plans. there will be no change in the use, egress, or occupancy under this applicatio…
Installation of temporary material hoist per plan submitted. work shall comply with 2022 building codes chapter:33. no change in use,egress and/or occupancy with this application.
interior and exterior renovation of exist. commercial space work on 1sf floor with repair ceiling, replace floors, new partitions, painting , install new A/C unit and new kitchen h…
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Filing in conjunction with the new building for concrete work associated wtih the slab on grade, curbs and stem/knee walls within the cellar and misc planter areas on grade.
Construct a new building on the New York Presbyterian Hospital campus, ambulatory care facility 16 stories plus cellar and bulkheads.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
New domestic water piping, including backflow, softener, & associated appurtenances to be provided. Trench drain to be replaced. A new air compressor on the floor below will be pro…
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Install new sprinkler and standpipe system t0 accommodate the new 16 story ambulatory care building.
Interior renovation of retail space for restaurant. partial interior demolition and construction. new stair to cellar, partitions, fininsh floor, drywall ceiling, toilet, commercia…