Other Permits in Queens, New York
4,358 other permits filed recently
4,358 permits
Relocation of existing diffusers in conjunction with interior partition changes filed under 440603134
Installation of temporary construction fence as per plans. construction fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of supported scaffold for access to work locations. no change to use, egress or occupancy under this application.
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy.
Installation of debris chute for jhs 158q at 46-35 oceania street, queens as per indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of pipe scaffold for jhs 158q at 46-35 oceania street, queens in conjunction with alt# q01095088, q01036467 as indicated on plans. there will be no change in the use, egress, or occupancy...
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy.
Construction equipment- sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application, live load 300 # per square feet. sidewalk shed sh...
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy.
Sf/ps87q - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to dob # q01002065 no change in use, occupancy or egress
Sh/ps87q - for temporary construction equipment(shed) submitting on behalf of contractor, related to dob # q01002065, q08031940 no change in use, occupancy or egress
Proposed six (6) story + cellar mixed-use building.
Installation of new sidewalk shed for jhs 158q at 46-35 oceania street, queens in conjunction with alt# q01095088, q01036467 as indicated on plans. there will be no change in the use, egress, or occup...
Remove existing storefront assembly and Install new aluminum framed storefront system, Create new masonry wall openings in existing rear masonry wall, and build interior partitions for a new accessibl...
Application filed to renovate the existing 2nd floor - Unit B with modification of non bearing partitions with new finishes as per the plans filed herewith; No change to Use, Egress or Occupancy
Install temporary construction fence.
Structural work in conjunction with proposed one family dwelling dob job # q00978237-i1
TCU Removal and Playground Redevelopment
Replacenent of bricks as per plan.
Installation of construction fence as per the plans filed herewith. no change in use, occupancy or egress.