Use of Telehandler for SOE and foundation construction. This application is filed in conjunction with NBQ01118133-I1
Filing temporary fire alarm/ standpipe in conjunction with nb app q01049852
Proposed sprinkler work in cunjunction with new building app # q01262888-i1
Adjustment to CFM of kitchen exhaust. No change in use, occupancy or egress. In conjunction with NB Q00641359
Mechanical application filed in conjunction with NB, job number: 421693233.
Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-Q01087530.
Foundation / Earthwork application filed subsequent to NB GC, job number: Q08048244-I1.
Proposed new building , 3-story, 3-family with cellar
Filing herewith plans for New Building and for proposed denial to BSA.
Proposed new building , 3-story, 3-family with cellar
Proposed new building , 3-story, 3-family with cellar.
Installation of 10' curb-cut on 168 street. (bet. 90 ave & jamaica ave ; access to loading berth) in conjunction with nb#421133151. no change in use, egress, and occupancy under this application.
Proposed installation of heavy duty sidewalk shed for new building as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply...
Use of telehandler for site servicing during building constructions. This application is filed in conjunction with NB Q01002920-S1
Installation of a heavy duty sidewalk shed and pipe scaffold as per plans during new building work. no change in use, egress or occupancy. sidewalk shed & pipe scaffold to comply with chapter 33 of ny...
Herewith filed vertical and horizontal enlargement to existing house and convert to 1-family with adu. to meet with nb requirements. to obtain new c of o.
Install construction fence filed in conjunction with NB application Q01250751
Structure design for 2-strory new building with cellar.
Installation of temporary p/m hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist shall comply with chapter 33 of nyc building code of 2022.
FILING HEREWITH INSTALLATION OF PRE-CONSTRUCTION TEST PILES AND TEST PITS WITH SITE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED UNDER MPP Project-0000...