New Construction Permits in Manhattan, New York
57 new construction permits filed recently
57 permits
Structural scope for new building filed in conjunction with application M00951038-I1
Curb cut filed in conjunction with NB # 121188847.
Mechanical work in conjunction with NB M08022114-I1
Proposed installation of gas fueled emergency generator filed in conjunction with NB # M00643592-I1.
Support of Excavation for new building filed under M00950138
General construction work for Interior fit out on 19th floor (23rd floor marketing). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014 code..
Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Mini Crane installation for NB construction under M00755303-I1 as per plans filed herewith.
Foundation work in conjunction with a NB
Installation of temporary p/m shaft hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist to comply with chapter 33 of nyc building code of 2022.
Installation of interior non-bearing partitions and related finishes, hung ceilings and related work, as per drawings filed herewith filed in conjunction with NB #M00505081. No change in use, egress o...
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with chapter 33 of the 2022...
Installation of temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Cut and grout piles as per plans. No change to use, egress, or occupancy. Filed in conjunction with NB# M00542354-I1.
Support of excavation filed in conjunction with nb job number m01243425-i1.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of temporary p/m main hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc building cod...
Use of knuckleboom for SOE and foundation construction. This application is filed in conjunction with NB M01145329-I1
Installation and use of construction shanties at cellar and first floor levels as per plans filed herewith. This application is filed in conjunction with NB M08018629-I1.
Mechanical Systems filed in conjunction with NB # M01257465-I1