Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Full demolition to an eight story building
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
Renovation at 3rd floor apartment including minor demolition and partition construction.
Full demolition to a two story building
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Interior renovation of apt. 28e with minor demolition. remove & relocate non load bearing partitions per plans. no change in egress, occupancy or use is involved under this application.
Demolition and general construction work on partial 25th floor as per plans. No change to use. egress or occupancy.
Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy.
full demolition of 3 story structure
Removal of non-load bearing interior partitions and all mechanical equipment in association with full building demoltion, by others. there is no change to use, egress, occupancy, or fire protection.
Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
Minor demolition with installation of new partitions on the cellar and 1st floors as per plans. No change to Use, Egress or Occupancy.