Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
installation of construction fence to protect site, during full demolition
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Full demolition to an eight story building
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Full demolition to an eight story building
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
installation of construction fence to protect site, during full demolition