Pool & Spa Permits in Manhattan, New York
336 pool & spa permits filed recently
336 permits
Filed herewith interior renovation of existing retail space at cellar and 1st floor accessory to wellness center. Scope of work will include installation of convenience stair and LULA. No change of us...
New 18 story residential building with commercial space on the first floor. west side 12 stories, east side 18 stories.
Interior alteration to the 8th floor to include assembly space in conjunction with current business use occupancy. Filed in conjunction with PA M01334767-I1.
Altco filed for interior renovation and tenant fit-out on the 1st floor commercial space, and cellar floor change to a coffee shop as per plans filed herewith.
Interior fit-out of existing space. no change of use, egress or occupancy under this application.
Alteration of existing commercial space on 1st floor including new lighting and heat pump system. no change to egress, use, zoning.
Sprinkler work as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Interior renovation of existing office space including the installation of partitions, doors, floors, and finishes on the 32nd Floor (Moroccanoil Office), as per plans. No change to use, egress, or oc...
Modification of existing sprinkler system for 14th floor office space. no change to use, egress or occupancy.
Propose to install new non-illuminated stainless steel letters on aluminum raceway for existing commercial space at 1st floor. no change to use, egress or occupancy.
Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egre...
Interior Alteration of 1st FL retail space (Barber Shop), No change in use, occupancy, or egress.
Legalization of work performed at the cellar & 1st floor commercial space as shown on plans submitted herewith. This application shall replace prior application #140718356, 121416182, 120027167, which...
Standpipe modifications for 9th floor commercial space as per plans filed herewith.
Replacement/stitching of cracked/spalled brick, brick repointing, concrete sill repair, sealant replacement, hairline concrete crack repair. no chnage in use, egress and occupancy.
Propose mechanical work, installation of kitchen exhaust hood at existing commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.