Other Permits in Queens, New York
4,404 other permits filed recently
4,404 permits
Relieving wall for exposure 2 & 4, in-conjunction with immediate emergency declaration for full demo
Change use on portion of 1st, 2nd, 3rd and 4th floors. Create individual lobbies at first floor for separate tenants.
Chain Hoist installation as per plans filed herewith.
Filing for curb restoration and enlargement of existing curb cut in-order to resolve dob rca complaint # 4a19317.
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Installation of 6000 lb single personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application...
Proposed two story horizontal enlargement at the rear and second story horizontal enlargement at the front of existing one family residence.
Filing for temporary construction fence. No change in use, egress or occupancy.
Easy Scale Scaffold installation as per plans filed herewith.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the nyc building code.live load...
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
New Dunnage tied into existing dunnage.
Application filed to restore existing accessory cellar to prior legal condition to resolve ecb violations all as per plans filed herewith.
Install 8' temporary construction fence at the above address
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed new one car garage
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replace non-load bearing interior partitions with sound insulated partition walls, replace existing flourescent lighting fixture bulbs with l.e.d. lighting fixtures and installation of one shower in e...
Proposed new 5-story office building with bulkheads; related work as per plans.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...