Other Permits in Queens, New York
4,394 other permits filed recently
4,394 permits
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
application filed to enlarge at rear, exterior & interior walls; to remain 1 family
Hereby filing for the refurbishing of the existing cellar walls with support to the existing main house beam, new slab. no change in use, egress or occupancy.
Installation of structural work as per the plans filed herewith. no change in use, occupacy or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of structural work as per the plans filed herewith. no change in use, occupacy or egress.
Horizontal and vertical enlargement of existing 2 story building as per plan
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes. chapter 33. no change in use , egress or occupancy.
Interior partial demo plan for the existing one family house. no change in use, egress or occupancy,
Drilling and horizontal/vertical piping installation for Geothermal.
Modify the existing automatic wet sprinkler system on 1st floor work area at jamaica hospital axel building outpatient medical offices.
Installation of soe and foundation work as per the plans filed herewith. no change in use, occupancy or egress.
Erect construction fence to safe guard property filed in conjunction with gc q01356413. no change to the use, egress, and occupancy
Usage of (3) debris chutes and (2) material hoists attached to supported scaffold on east and north elevations. hoist and chute equipment is within school property and not open to public access
Install approx. 1,780 lf of supported scaffold at a max height of 105ft around ps42(q0 school building and rear courtyards
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffol on the southwest corner of the backyard from the floor to past top of the paraper wall.
Filing for installing 8' high temporary solid construction fence
The proposed work consists of installing a new heating and cooling system on the cellar, first and second floors of the building. The system will include heat/cool outdoor units and indoor ceiling cas...