Other Permits in Queens, New York
4,395 other permits filed recently
4,395 permits
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Installation of temporary construction fence for ps 184q at 163-15 21 road, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence for ps 09q at 58-74 57 street, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Foundation work for slab on grade replacement and new piles as per plans filed herewith. no change in use, egress or occupancy.
Proposed a new 2-story residence for a single-family detached residence with an ancillary dwelling unit. proposed adu located at the rear of the 1st floor with the main entrance facing the rear yard....
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of construction wood fence. no change in use, egress or occupancy.
Installation of temporary fence
This ALT-2 application is filed to legalize existing conditions at the left side facade only and to resolve ECB Violations 34843208X and 34939928K. Scope limited to documentation of existing exterior...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of deep foundation elements as per plans filed.
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
File general construction work of proposed hair salon with new partition and paint. no change in use, egress or occupancy.
Pipe Scaffolding Installation
Temporary Construction Fence Installation
Remove select interior non-bearing partitions, door, and finishes within existing laundry and half-bath area. construct new non-load-bearing partitions. install new wall-mounted cabinets and custom sh...
New two-story & cellar, two-family building.
Proposed 8 Ft high plywood construction fence