11,088 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Finish Out for Lab 4.0 - Second Floor Contains Office Labs Training and Breakroom. First Second and 3rd Floor (3) Applications
New Plumbing for SFR in ETJ
Run/ mount 15 of 1 black Iron pipe to generator NO trenching
New Construction Electrical 4500 sq. ft. ETJ
Replacement of an existing water heater
Updates to existing HVAC and electrical systems to improve indoor air quality and thermal comfort introducing additional outside air and air conditioning capacity. No changes that…
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [3 bed 3.5 bath] with Attached 2-car Garage 3 bedroom 3.5 bathroom.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase1-A.
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 2 ton single stage Goodman system. New GLZS4 heat pump conden…
Finish Out for Lab 4.0: Third Floor Contains Office Labs and Break Rooms First Second and 3rd Floor (3) Applications
Overhead Homebuilder Loop Ref: 2026-002369
Tunnel Proyect replace plumbing for 2 full bathrooms washer kitchen sink dig around 60 feet remove cast iron pipe and install PVC sch 40 dwv. Install new sewer line from the house…
New 2 Story SFR 4 Bed/3 Bath with attached garage
New 2-Story Single Family Residence with 1 car garage 3 bedrooms 2.5 baths attached covered patio
Interior remodel conversion of an existing laundry room/mudroom into a mixed use space consisting of a half bathroom addition and a laundry area.
Addition/Interior Remodel - Approx 612 sqft Interior remodel to existing single family adding half bath converting existing garage into new master suite - adding 612 sqft new attac…
temporary tpole for new construction in Easton Park Ref 2025-091979 BP
Replace sewer ejector station and discharge line for guest house in the back approximately 90 feet of 2 inch forced drain discharge line and replace with schedule forty PVC.
Renovation of an Existing Bar to a Pizzeria Bar
1st and 2nd story addition with interior remodel to existing residence