6,226 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Removal and installation of plumbing fixtures and related piping as per plans. no change to use, egress or occupancy.
WEILER - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies
WEILER - Sprinkler modifications and new connections into existing standpipe for new floor control valve assemblies
Interior renovation of 3-story nycha multiple dwelling as part of the nycha pact renovation: installation of new ventilation systems, packaged air-conditioning units and miscellanc…
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under th…
replace spalled concrete in courtyard and boiler room. Install two new steel beams and new concrete deck with waterproofing. Provide temporary shoring for same.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Install chimney liner in existing masonry chimney per plans.
Subsequent filing to add pl work type for the installation of sanitary fixtures (1) wash sink (three compartments), (1) hand-wash sink, and (1) grease trap inside ex 1st fl commerc…
It is proposed the mechanical work for demising existing retail space #212c inlevel 2 with no change to use, egress, and occupancy.
This application is being filed for structural work at the subject premises for the repair of the underside interior of the ceiling slab at apt 2f, 6e,7a,7b,7c,7d,7e,7f,7g,7h &7th…
It is proposed the general construction for demising existing retail space #212c in level 2 with a 1-hour fire rating wall and new rear door for new storage area. no change to use,…
work includes per the filed plans remove/replace existing roof membrane and flashing, parapet replacement, remove/replace cracked/spalled masonry units, sealant replacement, remove…
Temporary shoring of basement framing
Install new gas service, meter and piping.
Installation of PV sesten on existing roof no change to egress or use of occupancy
Install temporary office trailers for temporary use at OSP. No change in use, egress, or occupancy.
Subsequent structural application filed herewith.
Installation of suspended scaffold for facade inspection/repair.
Filing herewith for plumbing work associated with the renovation of Article 28 Medical Office Space. Work to include, but not limited to, new fixtures and related plumbing. No chan…