6,420 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
515X- Support of Excavation for Utilities related to Con Ed Vault correspondent to NB application # X00875055. All as per plans filed herewith
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Filing curb cut as per plans associated with Alt-CO job #X01194505-I1.
Installation of sidewalk shed as per plans in conjunction with job# x01085184. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress un…
Foundation and earthwork specifications filed in conjunction with gc applicaiton job # x01196700-i1
Filed to clear the open violation #39090513k for work without permit. remove non complying attic & roof area, replace with. new roof above 2nd floor. no change of use, egress, occu…
Replace the entire existing masonry parapet wall that has partially collapsed with a new metal stud parapet wall.
Herewith filing new school building
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
2 families house new building
Filing curb cut as per plans associated with Alt-CO job #X01194505-I1.
Filing herewith installation of active sub-slab depressurization system for new building as per plans.
Installation of temporary construction fence at 1517 morris avenue, bronx, ny 10457 as indicated on plans. there will be no change in the use, egress, or occupancy under this appli…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code. no change in use, egress or occupancy under this app…
Furnish and install air-conditioning units, heat pump, fan coil units, energy recovery ventilator etc. as shown on drawings. existing supply and exhaust ductwork to be removed. exi…
New Apartment Building
Mechanical work as per plans filed.
Install (1) bath tub, (1) lav., (1) toilet, (1) kitchen sink and 1 electric stove on 1st floor. install (1) toilet and (1) lav and 4 burner/ hwh combo in cellar as shown in plans.
Installation of the temporary plywood fence at at 741 whittier street, bronx, ny 10474 as indicated on plans. there will be no change in the use, egress, or occupancy under this ap…