6,420 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed horizontal and vertical enlargement of an existing two-story building to a four-story, 8-family residential building. Obtain a new C/O.
Installation of construction fence at 3850 review place - bronx, ny, as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence at 1517 morris avenue, bronx, ny 10457 as indicated on plans. there will be no change in the use, egress, or occupancy under this appli…
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Replace boiler and gas/oil burner and change grade of fue oil from #4 to #2.
Filing herewith installation of active sub-slab depressurization system for new building as per plans.
Installation of the temporary plywood fence at 2084 anthony avenue, bronx, ny 10457 as indicated on plans. there will be no change in the use, egress, or occupancy under this appli…
Nycha throggs neck addition, bld. #33 - installation of +/-20 feet high x +/- 155 feet long temporary supported scaffolding on the roof level, as per plans, for bulkhead roof repla…
Installation of solar panels on roof. no change in use, egress, or occupancy.
2 families house new building
Cap and remove water piping for removed fixtures and remove bathroom fixtures in locker rooms. Install new storm piping and connect to existing.
Remove and install partitions, wall furring, flooring, rubber base, wood flooring, steel base, windows, ceilings & soffits, doors/frame and hardware, finishes. provide painting thr…
Interior renovation of existing building, new finishes, new doors, new interior lighting fixtures, & new plumbing fixtures in existing locations on existing roughing.
Temporary Construction Fence in conjunction with New Building # X01179407-i1.
Herewith filing foundation application for new school building.
It is proposed to file for structural work for proposed new school as shown on plans
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of photovoltaic solar array on existing roof system as per plans
Herewith filing new school building