6,318 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of roof dunnage for new heat pump units. Installation of new concrete pad for outdoor unit for new split system for BlackBox Theater.
Modification of an existing Verizon site. Replace natural gas service from basement gas meter to generator replacement on roof filed under DOB application no. X00802727-I1. All wor…
Removal and installation of interior non-bearing partitions and related finishes for tenant fitout (suite 15 - csc store# 24076 / wtz store# s-906) as per plans filed herewith. no…
New Building - Waste Transfer and Recycling Station
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy
8904-MH Disconnecting 2 existing RTUs and replacing units for future tenant as per plan. No new gas piping all work done after Gas shutoff valve. No change in egress use group or o…
Install new distribution ductwork existing air handler and condenser to remain (package unit) No change to use , bulk or egress
Filing for plumbing work as per plans. no change in use, egress or occupancy.
Respectfully filling to demolish detached 1 Family house with hand held tools
Proposed mechanical work including but not limited to relocation of existing air handling units and new duct work for new tenant banana republic. no change to use, egress, or occup…
Modifications to hvac system for tenant fitout (suite 15 - csc store# 24076 / wtz store# s-906) as per plans filed herewith. no change in use, egress or occupancy under this applic…
Proposed 10 feet curb cut including splay in conjunction with nb#x01102412
Removal and replacement of the existing steam supplied hot water generation to a direct natural gas fired water heating system. additional supply and return piping at basement leve…
Proposed temporary construction fence outside the property line but within 3 feet of the property line
Suspended scaffold outrigger system at 1400 pelham parkway south, bronx for facade restoration work with inspections. there will be no change in the use, egress, or occupancy under…
Hoist Installation only.
temp construction fence 8' high at lot lines
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Structural specifications filed in conjunction with gc application #x01097144-i1.