16,233 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior and exterior renovations consisting of minor demolition and construction as per plans filed herewith. structural, mechanical and plumbing filed separately.. no change to u…
Structural repairs to include crack reparis and repairs to roof and railings
Herewith filing for a construction fence
Plumbing application for a renovated (2) two family dwelling,filed in conjunction with alt ii application # b01267754-i1 install new plumbing fixtures as per plan
Plumbing work on two family house at cellar, basement, 1st, 2nd, 3rd floor, in conjuction to alt2 job# b01189507-i1. no change in use means of egress or occupancy.
Installation of temporary plywood panel enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this app…
Installation of two (2) new rooftop hvac units that connect to the existing supply / return infrastructure. there is a new fitout level air distribution network on level 4, which i…
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Applic. filed to install new handicapped toilet plumbing fixtures & piping at 001 for existing Retail or Service Establishment. General Construction work for new handicapped toilet…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
INSTALLATION OF 2 TEMP. BOILERS WITHIN PROPERTY FOR USE DURING NEW BOILER INSTALLATION, IN CONJUNCTION WITH LAA# B01287237-I1. BOTH BOILERS (Temp-1 #40000205559N00011, Temp-2 #4000…
Revovation of existing three family house as per plans at cellar, 001 and 002, no chagne in use, egress or occuapncy
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing application to install kitchen hood, exhaust duct and fan on first floor to roof as per plan.
Installation of 74.36 kw solar energy system on roof. No change of occupancy, use or egress.
Plumbing demo in existing commercial building
Rooftop solar installation. no change to use, occupancy or egress.
Installation of new hvac split unit for apt. 2a of existing four story residential building. no change in occupancy, use, or egress.
Application file for interior renovation work inside the commercial space as per plan. there will be no change in the use, egress, or occupancy under this application.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.