15,990 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
RENOVATION OF EXIST'G APARTMENT AT 1st FLOOR. NO CHANGE USE, EGRESS OR OCCUPACNY
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
phase 2
Interior renovation for tenant fitout in mixed use building - in an existing eating & drinking establisment (under 75 persons)
Installation of outrigger beams (needle beams) to support scaffold & roof protection as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of…
Existing 1 family house with mechanical work at cellar,1st, 2nd floor and attic. job filed to related to alt2application # b01381024-i1.2. no change in use, means of egress or occu…
Suspended Scaffold for Facade Restoration as Shown on Plans
installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51 KW
Alteration 2 to renovate existing 1 family on 1st floor.existing 2 story brick store & 2 family dwelling. partition work as per plan, no change of use, occupancy, exits. applicatio…
Refile existing expired approved plans, show as-built conditions and obtain a new certificate of occupancy
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
Proposed new horizontal enlargement of an existing 4 story building, existing foundation and structure to remain, enlargement to be construction class iii-a and building proposed t…
Installation of temporary fence
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Application filed herewith to Combine two dwelling units into one under TPPN 3/97 with NYC DOB Required for Final inspection. PL Work will consist of removal and installation of ba…
Installation of PV solar on existing roof no change to egress or use of occupancy
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egres…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occup…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occup…