15,798 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Existing 1 family house with mechanical work at cellar,1st, 2nd floor and attic. job filed to related to alt2application # b01381024-i1.2. no change in use, means of egress or occu…
herewith filing for general construction modifications to the roof B Midwood - Mount Sinai. No change in use, egress, or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.785kw
Subsequent filing for kitchen hood and HVAC system modification in an existing retail space (Suite C06) as per the plans filed herewith. No change in use, egress or occupancy.
Existing 1 family building with interior renovation withpartition work at the cellar,1st2nd floor and attic under this application.2. no change in use, means of egress or occupancy
Foundation work in conjunction with nb application # b00975270-i1
1. install 2 new doors in the 2nd floor as per plan.2. create a new opening in the 2nd floor as per plan.3. remove exist. interior door and close with new wall as per plan.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egres…
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Minor interior renovation as per plans. no change of use, agress or occupancy
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Proposed temporary soe work for a (6) stories with pent-house mix-use building and structural reinforced concrete foundation wall with underpinning and self-underpinning constructi…
Plumbing work associated with interior renovation of exist. 4 sty./4 family bldg. No change in use, egress, or occupancy.
Development Hub Job. Initial Consultation Nov 29, 2021 @ 11:30 am. Please submit to Development Hub. Erect a new 30 story mixed-use building.
Bmh cch: facade repair as per plans filed herewith. no change to zoning, use, egress, or occupancy.
GEN. CONSTRUCTION OF EXIST. 2-FAMILY HOUSE ON BASEMENT FLOOR AND FIRST FL. ALL WORK AS PER PLAN SUBMITTED. REMOVE (2) CAR GARAGES UNDER EXIST. CO NO. 102184. AMEND TO (0.5) DWELLIN…
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egres…
Interior renovation to remove non load bearing wall and install new stage decking, change access to one bathroom and install a shower. no change in use egree or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Engineered Enclosure to be installed on supported scaffold as shown on drawings in conjunction with NB# B01043157 .