16,102 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
2025 wildfire, supplemental to 25010-30000-02931 to change engineer of record, and change construction from conventional wood framing to light guague steel framing, inelegible
ePlan. REPLACE AND UPGRADE GUARDRAILS AND HANDRAILS TO (E) APARTMENT.
**ePlan**LAX** This is a supplemental permit for the Main Scope CBRA Room permit (24016-10000-13320). This is a revision to Level 2 Sector C12 and C9 for the following: SCOPE OF WO…
Remove and replace (e) covered deck at rear of sfd. repair and replace fire damaged portions of sfd. interior remodel to add one bedroom and bathroom. remove and replace doors and…
supplemental ref to pcis# 25048-10000-01610, to change work description from non-illuminated monument sign to illuminated monument per originally stamped plans.
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_28_Squares. Class A roof covering is required within Very High Fire Hazard…
Remodel (e) swimming pool and spa per standard plan # 268 and supplemental details (1 of 2)
Temporary shoring for new 1-story adu with basement.
EPLAN. Modification to an existing unmanned wireless telecommunication facility.
(5) bathroom remodel for residential buildings (no structural changes). MEPs Inlcuded
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very Hig…
Supplemental permit to 21014-10000-00829 to correct inventory and use codeno fee department error
New grading work
Supplemental permit to 17016-100002-02403 to change contractor to :CORBETT CONSTRUCTION PARTNERS INC
"Small lot subdivision pursuant to Tentative Tract No./Preliminary Parcel Map No. VTT-83745-SL-HCA. A certificate of occupancy (temporary or final) shall not be issued until after…
Supplemental permit to 26030-30000-01115 to R&R site.
Replacement of damaged framing members (less than 10% of replacement cost of building) for single family dwellings and duplex (not including decks).
[ePlan] Tenant improvement to expand existing restroom to accommodate a new shower and to comply with current accessibility requirements.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 37 Squares. Class A roof covering is required within Very High Fir…
New 5 story 29 units (3 eli = 10%) affordable housing apartment to include 4 story type iiia apartment over 1 story type ia apartment / parking over 2 level type ia subterranean pa…