24,215 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary pipe scaffold as per plan. no change in use,egress, or occupancy.
New sprinkler protection to include Fire Pump, Riser, Floor control assemblies, drain risers. Replace exist. fire hose racks with new fire valve cabinets. Standpipe system modifica…
Herewith filing for interior renovation of existing retail store as per plans.
Structural work filed in conjunction with combination of apts 1505 (14th fl) with apt ph (15th fl). structurally frame proposed convenience stair opening between 14th & 15th floors…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Refile bis job # 140834649 remodel apt 3d on the second floor. no change in use, egress or occupancy.
Exterior facade repairs on the north, south, and east elevations. no change in use occupancy or egress.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Modification of plumbing fixtures.
General construction to renovate apt 3f on the 3rd floor. work will include a new kitchenette and new plumbing fixtures. no change in use, egress, or occupancy under this filing.
New, replaced, relocated and capped plumbing fixtures and/or appliances as per Plumbing Drawings.
Refile bis job # 140834649 remodel apt 3d on the second floor. no change in use, egress or occupancy.
Unit 3fw interior renovation. remove and install non-bearing partitions. no change in use, occupancy, or egress under this application.
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Standpipe work related to Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th f…
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress u…