24,840 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Equipment use (56 st hoists): installation of dual 7000# capacity personnel hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use…
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Non-illuminated non-advertising accessory entrance awning approved as per nyc landmark preservation commission docket# 26-04802. no change of use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Plumbing work related to renovation and enlargement of two existing townhouse. No change to use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Fn/ps155m - for temporary construction equipment (fence) submitting on behalf of contractor, related job number # m00700607 no change in use,occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
M152-replace roof drains & storm piping.
Facade repair/replacement to include masonry, pointing, caulking, lintels, sills, terracotta, and coping stone.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Sprinkler and Standpipe Systems filed in conjunction with ALT #122420193
Subsequent filing of structural work type. all as per plans filed herewith. no change in use, egress or occupancy.
Renovation of existing triplex apartment . this alteration will consist of a new kitchen and bathrooms. the existing convenience stairs n the apartment are to be reconstructed as p…
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Interior renovation and mechanical hood of for commercial kitchen at 001 stall#s6, and basement floor #c3, as per plan filed herewith. no change in use, egress or occupancy.
Full demolition to a four story building
Interior renovation existing commercial space with partition work on 1st floor and mezzaine. no change in use, egress or occupancy.
Plumbing work performed in association with Interior Renovations work done in Apartment Unit 10C. No Change to Use, Egress or Occupancy under this application.
Mechanical work filed in conjunction with renovation of existing apartment 15a. install new dx split system for the kitchen. no change to use, egress or occupancy.