24,644 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Pintard hall - modification and installation of plumbing fixtures.
Interior renovations consisting of partitions and finishes along with mechanical ventilation as per plans filed herewith. No change to use, egress or occupancy
General construction for interior renovation of Apartment 4F on the 5th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade repair work at 188 east 64th street, manhattan, ny 10065
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
Installation and use of temporary suspended scaffold for facade repairs and inspection as per plans filed herewith. no change to use, egress, or occupancy under this application.
16th floor tenant build out, interior renovation of existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to…
New 18 story residential building with commercial space on the first floor. west side 12 stories, east side 18 stories.
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc bui…
Replace existing thru-wall ac unit in Apt 6C. No change to use, egress, or occupancy.
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Removal of existing sprinkler head and installation of temp loop as per plans filed herewith. No change in use, egress or occupancy under this application .
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabil…
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or…
Plumbing modifications taking place in the cellar as per drawings filed herewith. no change in use, egress or occupancy.
Triplex. combination of apartments 2ab/3b as per tppn #3/97, new convenience stair connecting 1st & 2nd floors & smoke-proof partition, new convenience stair connecting 3rd & 2nd f…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…