24,215 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
General construction work filed to install a chain-link fence surrounding located within the property line. no change to egress, use or occupancy.
Installation of knee bracket as per plans. no change in use occupancy or egress under this application.
Replacement of existing air conditioning units to provide cooling for existing duplex dwelling unit. Related ductwork and diffusers. Install electric radiant heat in toilet. No cha…
Converting existing building from 4 apartments and furnished room into 2 family dwelling units within the same envelope as perplans submitted. the application is also filed to cure…
FISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification of plumbing system as shown on plans.
Sidewalk Replacement and Vault Repairs as per plans filed herewith. No change of use, egress or occupancy.
Remove and replace existing roof drains and partial associated storm piping.
Provide exterior site drain inlets and piping to existing site storm system.
Minor demolition and general construction for interior renovation of bedroom and primary bathroom on floor 3, of residence. Architectural work to be reviewed under 1968 BC. Plumbin…
Plumbing work associated with the fitout of the berriebuilding expansion
Alteration type 2 application filed for installation split ac units. no change of use, egress or occupancy under this application.
Facade repairs to include masonry, pointing, lintels, terracotta as per plans.
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of heavy-duty sidewalk shed for repairs as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 20…
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
Install illuminated non-advertising wall sign on raceway
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Filing fence application as per plans. no change to use, occupancy or egress on this application.