5,678 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
. Installation of two ductless mini-splits to provide cooling to electrical rooms located on 1st and 2nd floors of parking garage. 2 plan sheets are located in the for-reference fo…
furnace replacement
Hook up existing gas to new furnace (A&E BLDG1163366)
Boiler replacement. gas work subbed to karpe mechanical (bldg1163375)
Hook up gas to new boiler (A & E BLDG1163374)
Furnace replacement. Gas work subbed to Karpe Mech (BLDG
Hook up existing gas to new furnace (only gas) - (A & E BLDG1163372)
Hook up gas to boiler-gas only (see BLDG1163358)
Boiler replacement. gas work done by karpe
Boiler replacement. Gas work subbed to Karpe Mechanical (BLDG1163363)
Replace Furnace - Gas work subbed to Karpe Mech (BLDG1163368)
Bathroom remodel work in existing single family house. aaj (project dox plans) - remodel existing bathtroom to create new bathroom floor layout as noted on floor plan as required b…
Furnace replacement
Replace boiler
Install new gas pipe from mechanical room to fireplace
REMODEL BATHROM - PILSBURY UNITED COMMUNITIES const type: IIB occupancy: A-1 2020 MSBC occupant load: 172 sprinklered: YES architect: 23558 - Walz, Jeffrey Lee @ GENSLER
Construct detached __22'0"_ by _24'0"__ wood frame garage with no attic storage. aaj (project dox plans) ***note: provide garage wall protection and portal frame wall brace at gara…
(DMH-Pdox) KITCHEN REMODEL IN SFD. DEMO/OPEN NON-BEARING WALL BETWEEN KITCHEN & DINING. REMODEL BASEMENT BATHROOM AND ADD SHOWER STALL. INSTALL INSULATION AND VAPOR BARRIER AT EXTE…
T/I GROCERY CHANGE OF OCCUPANCY = YES const type: IIB occupancy: M 2020 MSBC occupant load: 1111 sprinklered: NO sac: _0.89_ charges _1.00_ credits = _-0.11_ net met council letter…
Re-roof flat roof 2020 msbc