10,468 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed interior and exterior renovation to existing two story and cellar. one family to remain; to address open dob violations #25-02948; pl09rca04; sp02cp, and complaint #489435…
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Application #Q01345112-I1
Proposed installation of temporary fence as per plans. no change in use occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of temporary pipe scaffold for new building as per plans. no change in use, occupancy, or egress under this application.
Herewith filing for new 3-pc bathroom at cellar level as per plans. no change to use, egress or occupancy
Facade Restoration & Inspection
Subsequent file plumbing work in conjunction with job# q01343611-i1 for plumbing work. no change in use, egress or occupancy.
Interior wall work
Remove walls, doors, ceiling, lights, plumbing fixtures, and finishes. no change to use, egress or occupancy.
Handheld Full demolition of an existing one-story Garage building accessory to one-family dwelling.
Install partitions, ceilings, doors and hardware for restaurant on floors 3 & 5. no change to use, egress or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed nb-structural work for school ps216q
Add new plumbing fixtures for bathroom in cellar and plumbing fixtures for new interior kitchen for new one family dwelling unit on first floor
Installation of new electric hvac and split systems for existing (1) one family dwelling unit.
Install exterior illuminated blade sign (puregym)
Install exterior illuminated wall sign (puregym)
Installation of solar panels on roof. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 25 modules, 10.25 KW