10,468 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Subsequent file plumbing work in conjunction with job# q01343611-i1 for plumbing work. no change in use, egress or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.51 KW
Facade Restoration & Inspection
INTERIOR BUILD-OUT OF COMMERCIAL SPACE (UG-6 / VI): MINOR PARTITION WORK, NEW RESTAURANT EQUIPMENT AND FIXTURES, LIGHTING AND HVAC INCLUDING COMMERCIAL COOKING AND EXHAUST SYSTEM I…
Proposed two-story two-family new residential building
Proposed two-story, two-family new residential building
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of photovoltaic solar array on existing roof system as per plans
Temporary plywood construction fence to secure site for future construction.
Proposed interior and exterior renovation to existing two story and cellar. one family to remain; to address open dob violations #25-02948; pl09rca04; sp02cp, and complaint #489435…
Filing herewith installation of drive thru canopy elements as shown on plans. no change to use egress or occupancy
Dev HUB Job - Erect 2 Story new building.
#8990 - renovate existing 1st floor retail space including architectural, mechanical and lighting modifications. no change in use, egress or occupancy.
Renovation of an existing dunkin' donuts store on the 1st floor of an existing building. install new kx exhaust hood. no change in use, egress, or occupancy.
Installation of plumbing fixtures to obtain co
Plumbing application in conjunction with application #Q01337806.
new on-site curb with fence installation
Conversion of an existing 4-story, 5-family building with a cellar, to a 4-story, 4-family building with cellar with interior renovation on the fourth floor only. no change in bulk…
G11 & g12, filing interior renovation work on cellar floor as per plan filed herewith. no change in use, egress or occupancy.