10,644 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing for interior renovation of existing (1) one apartmentat second floor, repair/replace existing partition walls, sand and refinish existing wood flooring, new interiordoors, t…
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Propose interior renovation of existing two family dwelling co # 21855
Proposed plumbing work-type filed in-conjunction with alt-co job#: q01285277
Installation of photovoltaic solar array on existing roof system as per plans
1)legalize canopy at the front yard 2)legalize interior partition walls and doors in cellar floor. no change in use, egress, occupancy, and bulk.
Installation of combined sprinkler/standpipe system as per plans filed.
installation of construction fence
Establishment of commercial laundromat. interior renovation: remove non-load bearing interior partitions, erect new interior partitions, dryers vent, hot water heater vent, a/c ins…
Installation plumbing and sprinkler system as per plan filed herewith. no change in use, occupancy or egress.
Propose horizontal extension at existing open porch with general construction works as shown on plans. plumbing works are filed subsequently.
Provide new gas meters , gas water heaters and gas boilers
Propose to provide Partitioning GC renovation plans for existing 1 family 2 story . Propose plumbing filed on job# Q01312547-s2 and Mechanical plans filed on job# Q01312547-s1 .NO…
216q- support of excavation for utility street installation correspondent to nb construction work #q08026647. all as per plans filed herewith
Installing construction fence as per plan, conjunction with job #q01080855-i1. no change in use, egress or occupancy.
Installation of temporary consturction fence
Renovation of proposed restaurant with, repair/new partition, floor, ceiling, door, painting, wood joist, post, stair, storefront as per plan. no change in use, egress or occupancy…
Illuminated non-advertising accessory sign on sign band filed under job q01323875 - in property lines - northstar mitsubishi. no change of use, egress or occupancy.
Filing herewith installation of building signage as indicated on plans. No change to use, egress, or occupancy.
Installation of 6000 lb single personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy un…