10,644 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed interior renovation on 1st floor. supersede bis job #: 420039283. ceiling, flooring, partition work as per plan. no change in use, egress, occupancy or bulk.
Interior illuminated non-advertising accessory sign - in property lines - mitsubishi motors. no change of use, egress or occupancy.
Reface only of illuminated non-advertising accessory double-sided sign on ground structure permitted under job no: 400489547 - in property lines - mitsubishi motors. no change of u…
Removal of existing mechanical ventilation and hvac systems
Renovation of an ext'g commercial space on 1st floor of an ext'g bld'f. replace ext'g ceiling & floor tiles, lighting fixtures, & wall finishes. remove ext'g demising walls per pla…
Mechanical / hvac work as per the plans filed herewith.
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc departm…
Wall sign band for accessory signs - in property lines. no change of use, egress or occupancy.
Filing for construction fence
Party wall-tie back and water proofing / parging at exposure 4, in-conjunction with full demo of adjacent lot
Relocate existing lavatories & install new 2-fixture bathrooms, slop sink & floor drains as per submitted drawings. No change in occupancy, use or egress.
Modification of an existing sprinkler system on the 2nd floor at apple temporary store as per plans submitted herewith, no change in use, egress or occupancy group.
Structural work for entire building.
Existing 4 story multi-family building with interior renovation onpartition work in apartment #2e. no change in use, means of egress or occupancy
Plumbing (Underground) application filed subsequent to NB; job number: Q08048244-I1.
Rooftop solar installation. no change to use, occupancy or egress.
Propose a horizontal extension and new plumbing works as shown on plans. all other related works are filed subsequently.
22 Story Residential Mix use New Building with a Commercial use on First Floor.
Two-story plus cellar horizontal enlargement, remode existing mosoc, to obtain a new c of o
Installation of plumbing work as per the plans filed herewith. no change in use, occupancy or egress.