6,573 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
first floor foundation + underpining. foundation repair and underpinning, approx 10ft at the front
to obtain final inspection for work approved under pa# 201509237838, 201505075676, and 201607132205.
remove existing railing and install new railing with proper height per code. install metal staircase. install proper flashing and waterproofing. per boa decision: 25-048-3929
scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.
deferred submittal block 7 - prefabricated metal stairs pa# 202211297323-s3.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
install fail safe push through non locking pedestrain gate and rail
to abate nov 202287662- rebuild rotting back deck, stairs, wall system , rebuild at same size. rebuild stairs to meet code. replacement complying with current codes includes proper…
complete remodel of kitchen, powder room on 2nd floor, and full bathroom on 3rd floor. replacement of front and rear windows. upgrade of all trades: electrical, plumbing, and mecha…
infill addition at rear under 1st fl of existing house overhange and deck. addition to be for new sauna and new toilet room, non conditioned space. addition=85sf
solar permit: installing 10 solar pv modules, 440 watts per module, total no. of rating 4.4 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.50…
revisoin 201903114916- 1/fl added scope in the (e) mens restroom to meet ada requirements. remove (e) fountain and install a (n) ada compliant. replace flooring in both restrooms.…
solar permit: installing 17 solar pv modules, 440 watts per module, total no. of rating 7.48 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 5 kw…
floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17
install ground electric double faced sign (shell logo, fuel prices, v power, food mart)
ground floor: this project consists of a tenant improvement to an (e) food facility (formerly starbucks) with no change in occupancy classification, no expansion of floor area, and…
shoring design establishes a strategy for soil shoring, excavation segmented pouring for proposed foundation work under 202305268680. deferred submittal for soil shoring engineerin…
2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mech…
provide temp presschool location during construction under pa 202508082684.remove 3 int partitions,erect 5 partitions with4 int doors.infill (e) sunken floor with new framing.provi…
demo and reconstruction of second story and restrooms in response to the following notice of violations:nov#'s: 202425066, 202425811, and 202425824.scope of work is interior only.