recommencement and completion of work under pa 202501138174.
4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades.…
deferred electrical for ste 435 basement office ti under permit 202507150851.
reroofing: tear off (e) roof (tpo & dens deck). install insulation, 1/2" dens deck & white durolast pvc (7079 sq ft) no hot works.
rev to existing approved permit 2024-1212-6728. to show occupancy loads and call out assembly areas 8th fl. outdoor deck (8300), east patio (8301) breakroom (8246)
minor non structural lobby door support and building attachementsingle stor non structural tenant improvement. ref 202510298348
recify nov 202429598. remove interior walls, remove bathroom, remove kitchen stove, remove any unpermitted electrical work @ garage level
**ab-004** renovate and relocate the historic clubhouse from the southeast corner of the site to mid block on the western portion of the site fronting carolina st. the building's e…
**ab-004** site permit with shared plans for 202506128526 to include new foundation for (n) community facility on the east side of caroline st and 138 ft from north mariposa st.
replace (e) with walk-in shower. replace outlet @ vanity with gfci and dry wall patch.
revision to pa 202601284718 change framing non-structural from metal studs to wood studs
revision to permit 202510157443 to add 5 skylights
relocating (e) diseal powered generator 200kw 50 db from building 925 to building 921.
to obtain final inspection for work approved under pa#: 202412025878. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replacement inkind of roof finish & roof gutters, install (n) roof waterproofing, remodel 2 (e) dormers & demo 1 (e) dormer to create recessed roof terrace, reconstruction of 3/f a…
adminstrative permit to change of use & occupancy group s-2 warehouse to group b. research and development with accessor office. no construction work.
reroofing: tear off (e) composition shingles. install new 40yr landmar composition system. no hot works.
16th fl mechanical and electrical work for ti ref pa 202601214196
add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as n…