6,440 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolition
kitchen remodel cabinet replacement like for like no wall removal or layout change
unit 11: like for like bathroom remodel & kitchen remodel, subpanel upgrade, new tiles, shower valve, toilet, new cabinets and counter tops. no layout change, no wall stud framing…
comply 1-10 of nov#2026052622; remove (e) sliding window on basem level and replace with a (n) eero-compliant casement windows by construct patform at (e) basement window to provid…
demo and rebuild laundry room and rear exterior staircase in-kind, replace 4 rear windows and 1 door each on l1,l2,l3. add 2 sky lights at l3 roof. demo and remodel kitchen and bar…
recommencement and completion of work approved under pa# 202305057253 and 202402155971.
remodel interior stairs, paint (e) stucco and siding. convert portion of garage to adu under state program. new roof deck
revision to issued pa# 202505146433. revised to locate pl correctly. no encrochment or work beyond the pl.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
recommencement and completion of work approved under pa#202002275646, 202010025793, & 202011259699.
rear stairway repair. stairway lead to backyard. less than 50%.
installation of retaining wall, steps, landing on front yard.
revision 202211025698-s1- change stair design, add mech. room, convert rear window into french doors, pantry remodel
add new elevator and machine room to replace exiting elements along the side of an existing 2 story shopping center. gross sf is 19,322. overall footprint remains generally unchang…
revision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment.
rev 202601143857 & 202512192305: underpin (e) foundation along grile line 1 and c due to insufficient foundation depth. level out concrete slab on 1/f to match garage ch. window re…
1/f: remodel bathroom & convert family room to kitchennete per plan. repair and replace floor drain at rear yard.
remove and replace front house handrails, rear deck, 125amp main electical panel and water heater. all work is in kind and damaged is due to dry rot.
interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.
remove lath & plaster from walls & ceiling. replace with sheetrock 5/8" type x. at east property line wall provide rock wool or mineral wool insulation for 1hr fire rating.