3,004 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of solar panels on roof. no change in use, egress, or occupancy.
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
8' high wood construction fence
Construct two-family semi-detached residence with built in two car garage.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Plumbing Application in conjunction with G.C. Application.
Installation of all sanitary fixtures with associated piping, gas fixtures with associated piping and installation of septic system and storm water detention system.
Installation of solar panels on roof. no change in use, egress, or occupancy.
Proposed wood canopy located to the rear of the house
Registering one electric hot water heater, one warm air furnace, one gas residential gas stove and gas piping as per plans filed herewith.
Plumbing application filed in conjunction with alt for installation of new second floor 3-fixture bathroom. no change to use, occupancy, bulk or egress.
Construct detached two family residence with accessory off street parking for two cars and detached one car garage (filed under separate application).
Installation of New Split Multi Zone HVAC System.
Application is filed for the installation of 8'-0' high temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under th…
Proposed three story attached two-family dwelling with accessory built-in one car garage.
Filing for construction fence within 3ft from property line. filed in conjunction with new building s01343561-i1.
Repair of fire department damage due to fire at adjacent property.
Application is filed for the construction of a 8'-0 high plywood temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed…
1 story horizontal extension to rear of the building with interior alterations.
2A Elev.: Modification of interior partitions and finishes to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.