3,886 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Total demo of shed 384 sq ft circa 1968
Retroactive: Total demo of SFR 2400 sq ft circa 1968 Total demo of pool 500 sq ft circa 1968 total demo of shed 385 sq ft circa 1968 ***The building shall not be demolished until a…
installation of construction fence to protect site, during full demolition
Total Demo of SFR 672 sqft Circa 1947
Demolish (e) single family dwelling by handwrecking method - sewer cap is requiredsee comments for code enforcement details
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Herewith filing for full demolition of a fire damaged (1) story building used as a warehouse as per plans. a 2-man crew will utilize an 80 ft articulating boom lift to safely acces…
Demo (e) apartment building. sewer cap and pedestrian fence required, clear lot
Interior demolition of 2nd and 3rd floor office, interior demolition scope only. no change to use egress or occupancy.
Full demolition of 1-story garage in rear yard.
Demolition of doors, fixtures and finishes. New partitions, fixtures, finishes, and doors.
8 foot construction fence for demolition and future nb
Demolition - Interior
PONY EXPRESS -9552 SF M OCC BUILDINIG IS 2 STORY 2-A CONST MIXED OCC 563807 SF W/SPRINKLER Demoliti
Main floor unit # 1 and 2nd floor unit #2 remodel work in existing two family dwellings. aaj (project dox plans). demolition work: - partial interior demolition work of unit #1 to…
Demolition - Interior
Full Demolition - Complete demolition to create vacant lot
Main floor kitchen, powdwer and mudroom remodel work in existing single family house with attached garage. aaj (project dox plans). demolition work:. - interior demolition work to…
42 flr. suite 4250. demolition of non-structural partitions, elect millwork finishes and ceilings and lighting. construction of new partitions power, lighting finishes and millwork…
1st floor modify existing building - rear addition to add new kitchen and living area. approx 342 sq ft 2nd floor - also demolition of a (e) walk in closet area and interior modifi…
Minor Demolition - FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES. EXISTING STRUCTURES TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLAN…