5,066 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Sprinkler system modification for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation in existing retail space on 1st floor as per plan filed herewith. no change in use, occupancy or egress.
Proposed temporary construction fence at open space, install fence extending beyond 8 feet of the front property line and along the rear yard property line. as pre plan. in conjunc…
Temporary use of 3 above-ground swimming pools, access stairs, walkways and ramp outside heinz field on art rooney ave related to sec 5108 and 5109
Pool/deck/spa
Constr of new pool
Filing herewith sprinkler work in existing first and cellar space, American Eagle Outfitter STORE NUMBER: 2477 SPACE NUMBER: 560. No change in use, egress or occupancy.
Hereby filing to remove and construct interior partitions, ceilings and doors for tenant space as shown on plans filed herewith. No change to use, occupancy or egress.
Proposed pool / spa on deck. 3 of 4
AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress.
Backfill the (e) pool , shell to remain.
grading for excavation of new pool/spa and backfill of existing pool.
Filing for interior renovation of 11th & 12th floor peerless clothing office space as per plans submitted herewith.
Convert an existing commercial space into 8 business spaces for rent to an existing 1 story masonry building
Filing herewith sprinkler work in existing first and cellar space, American Eagle Outfitter STORE NUMBER: 2477 SPACE NUMBER: 560. No change in use, egress or occupancy.
At 5th floor tenant space, removal and installation of interior partitions, finishes, ceiling, flooring as per plans filed herewith. no change in use, occupancy or means of egress.…
Back fill the (e) pool and remove the shell.
Proposed temporary construction fence at open space, install fence extending beyond 8 feet of the front property line and along the rear yard property line. as pre plan. in conjunc…
Structural work to remove existing reinforcing steel from 23rd marketing floor (22nd Construction floor) for Common Fund space.
Proposed interior renovation for commercial space of existing mixed residential & commercial building with minor partitions work and floor finishes as per plan. No change in use, e…