5,066 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
2025 wildfire, supplemental permit to 25030-70000-03401 to revise scope of work to site grading for new basement of sfd and (e) pool backfill, shell to be removed, eo1
Remodel the (e) pool to add a 9'x11' spa and change the pool depth from 8' to 7' per city standard plan #268 and suppl. engineering details. all work within existing pool shell.
Eplan T.I. ALTERATIONS OF EXISTING 25TH FLOOR COMMON AREAS, CORRIDOR & TENANT SUITES WITHIN EXISTING 35 STORY BUILDING. SCOPE OF WORK INCLUDES: NEW NON-RATED CORRIDOR & TENANT DEMI…
Eplangrading permit for new pool and spa, new rw at rear property per engineer and soil report3 of 3
AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress.
***3 of 4***new swimming pool per soils report in bho and mulholland sp.
Sprinkler system modification for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
Mechanical system installation for proposed medical office space as per plans here within. No change it egress, use or occupancy
Interior renovation of commercial space on 1st fl. as per plan filed herewith. no change in use, egress or occupancy.
ti at 7th floor: convert existing space into an "apiro modular wall system" with intergrated lighting as new flexible office work space. limited to 7th floor
interior remodel of commercial space. kitchen remodel. add new ada bathroom. front of building interior cafe buildout. no structural work.
new adu under state adu programme. convert existing 1/f storage space into a 1-bedroom adu. new stairs from sidewalk to new unit. new utility room. no work on upper two floors.
Currin outdoor living is proposing the construction of a in ground concrete pool with surrounding na
REINFORCE EXISTING FLOOR JOISTS. NO CHANGE TO LAYOUT OF EXISTING SPACE ABOVE. (JJL) ALL JOISTS THAT ARE 198 INCHES IN LENGTH TO BY SYP #1 OR BETTER. ADD (2) 2X8 AT JOISTS #1, #3, A…
Remodel existing first floor spaces in to restaurant. first floor currently m and b occupancy. level 1 change of occupancy to a2. add sprinkler to first floor. r2 at levels above.…
Space # L1.4. Modification to existing mechanical system to accommodate new layout for Bath and Body work per plans filed wherewith. No change in egress, use or occupancy.
Muji (space g11) interior renovations to retail space as per plans filed herewith. no change in use, egress or occupancy.
Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.
Renovation of existing retail space. installation of partitions with wall, ceiling and floor finishes. no change of use, egerss, or occupancy under this application.
Modification to existing mechanical system serving space. Reuse of existing VAV boxes and associated controls. Modification of ductwork as necessary to accommodate new layout.