5,042 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New swimming pool on piles
Mechanical work for temporary space for Xantium Investments on 12th floor
Interior renovation of the commerical space in cellar. no chngae of use, occupancy or egress
At 9th floor south and 10th floor entire tenant space, structural additions/modifications and installation of convienence stair from 9 to 10fl in conjunction with tenant buildout g…
Space # L1.4 - Remodel and expansion of existing Bath and Body works. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures and entry doors per plan…
Renovation of existing office space 1902 & 1903. install partitions, wall and floor finishes. no change of use, egress, or occupancy.
Proposing work for new tenant space - remove (26) sprinkler heads on 1st Fl. Install (1) sprinkler head in Cellar, Install (33) sprinkler heads on 1st Floor, (1) 1st floor mezzanin…
ILLUMINATED, NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL.. SIGN WORDING: securespace SELF STORAGE
grading excavation for the new pool and spa.2 of 2
Eplan. New pool and spa in rear yard per engineer design with soils report. Grading for proposed pool.
Sc 2019 cbc interior build-out for a ground floor retail sales space, 5 story type iiia construction type masonry building, as per plans
Excavation for new pool and spa.
New irregular shaped 29'-6"x25'-0" pool with a 10'x9' spa per city standard plan #268
ePlan - SUPPLEMENTAL TO 23030-10000-02822 TO CAPTURE ADDITIONAL SITE GRADING FOR PROPOSED POOL DECK
Interior renovaition, installation of new non-load bearing walls, doors, wall and floor finishes, ceilings and millwork on 8th floor office space as per plans. no change to use, eg…
Proposed pool for new sfd. 4 of 4
Re-buildnig existing pool same location layout no change to impervious cover. This is a rebuild due to failing concrete. No changes to deck size.
At 9th floor south and 10th floor entire tenant space, structural additions/modifications and installation of convienence stair from 9 to 10fl in conjunction with tenant buildout g…
New construction in-ground pool and spa with concrete deck.
Subsequent filing for the installation of 8' height temporary construction fence at open space, as required for storefront replacement. no change to use, egress or occupancy.