13,371 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical modifications taking place on the 8th floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of new RTU, ACCU, associated ducts, piping and equipment as per plans. No change in use, egress or occupancy.
Mechanical changes as indicated on plans.
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Propose installation of (1) air-cooled package unit (10th flr) with associated ductwork (7th & 10th floor). No change to use, egress or occupancy.
Mechanical changes as indicated on plans.
Installation of mechanical system for a 5 story residential building in conjunction with b01245472-i1.
Mechanical modifications to the 9th and 10th fl as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical work filed in conjunction with merger & conversion of ex. structures to a one-family residence, alt-co b07998269. install new vrf split-system, related ducts and piping.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Interior & exterior alterations to existing 2 story brick building with basement 3 d.u. and new rear 2 story open wood porch. architecture, plumbing, hvac, electrical, refrigeratio…
Mechanical work in conjunction to GC JOB#B01193867-l1. No change in use, egress, or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Site Plan Condo: Proposed construction of 2518 sq ft single-family residence with 3 bedroom 3.5 bathrooms 2 car garage
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System & Repair Or Rebuild Of The Supply Air Plenum